Evaluation of the Learning Curve in Low Anterior Resection for Rectal Resection With the Two Surgical Robots
Accelerated Learning Curve in Low Anterior Resection for Rectal Resection, a New Surgical Robot Micro Hand S Versus da Vinci, Can be Attained Simultaneously: a Single Center Experience
1 other identifier
interventional
112
1 country
1
Brief Summary
Central South University in collaboration with Tianjin University developed the first domestically produced Chinese minimally invasive surgical (MIS) robot system which named "Micro Hand S" in 2013. This new MIS robot had been authorized to enter the clinical trial stage by the Ethics Committee of the Third Xiangya Hospital at Central South University. The Micro Hand S robot is safe and feasible in the preliminary study. However, the learning curve in low anterior resection for rectal resection with the Micro Hand S robot are unclear and whether the two surgical robots (Micro Hand S and da Vinci) shared a similar learning curve and the two robot can be trained simultaneously. Therefore, the investigators conduct this retrospective study to focus on this concern.
Trial Health
Trial Health Score
Automated assessment based on enrollment pace, timeline, and geographic reach
participants targeted
Target at P50-P75 for not_applicable
Started May 2017
Typical duration for not_applicable
1 active site
Health score is calculated from publicly available data and should be used for screening purposes only.
Trial Relationships
Click on a node to explore related trials.
Study Timeline
Key milestones and dates
Study Start
First participant enrolled
May 1, 2017
CompletedPrimary Completion
Last participant's last visit for primary outcome
August 31, 2018
CompletedStudy Completion
Last participant's last visit for all outcomes
October 31, 2019
CompletedFirst Submitted
Initial submission to the registry
April 18, 2021
CompletedFirst Posted
Study publicly available on registry
April 22, 2021
CompletedApril 22, 2021
April 1, 2021
1.3 years
April 18, 2021
April 18, 2021
Conditions
Outcome Measures
Primary Outcomes (3)
learning curve of console time
It was defined the cumulative sum plot of the consloe time in the chronological order.
up to 1 week after operation
learning curve of docking time
It was defined the cumulative sum plot of the docking time in the chronological order.
up to 1 week after operation
learning curve of surgicla failure
It was defined the cumulative sum plot of the docking time in the chronological order.
up to 1 week after operation
Secondary Outcomes (18)
Type of surgical procedure
up to 1 week after operation
Operative time (min)
up to 1 week after operation
Console time (min)
up to 1 week after operation
Docking time (min)
up to 1 week after operation
Conversion
up to 1 week after operation
- +13 more secondary outcomes
Study Arms (2)
Surgeon A
EXPERIMENTALThis group is consisted of 56 cases performed using the Micro Hand S robot and da Vinci robot by one single surgeon in low anterior resection for rectal cancer
Surgeon B
ACTIVE COMPARATORThis group is consisted of 56 cases performed using the da Vinci robot by one single surgeon in low anterior resection for rectal cancer
Interventions
The surgeries are performed with the Micro Hand S robot and da Vinci robot
Eligibility Criteria
You may qualify if:
- histologically confirmed rectal cancer; ASA score ≤ 3
You may not qualify if:
- palliative resections, combined resections, distant metastasis, a previous history of abdominal/or pelvic surgery
Contact the study team to confirm eligibility.
Sponsors & Collaborators
Study Sites (1)
The Third Xiangya Hospital of Central South University
Changsha, Hunan, 410013, China
MeSH Terms
Conditions
Condition Hierarchy (Ancestors)
Study Design
- Study Type
- interventional
- Phase
- not applicable
- Allocation
- NON RANDOMIZED
- Masking
- SINGLE
- Who Masked
- OUTCOMES ASSESSOR
- Purpose
- TREATMENT
- Intervention Model
- PARALLEL
- Sponsor Type
- OTHER
- Responsible Party
- SPONSOR
Study Record Dates
First Submitted
April 18, 2021
First Posted
April 22, 2021
Study Start
May 1, 2017
Primary Completion
August 31, 2018
Study Completion
October 31, 2019
Last Updated
April 22, 2021
Record last verified: 2021-04
Data Sharing
- IPD Sharing
- Will not share