Effect of His-Ventricular (HV) Interval Optimisation in Cardiac Resynchronisation Therapy
A Randomised Cross-over Pilot Study of the Effect of His-Ventricular (HV) Interval Optimisation in Cardiac Resynchronisation Therapy
1 other identifier
interventional
14
1 country
1
Brief Summary
Cardiac resynchronisation therapy (CRT) is a specialised type of pacemaker used in patients with severe heart failure to improve symptoms and survival. Approximately one third of patients treated with CRT do not notice significant improvement in their symptoms and this may be due to inadequate co-ordination between the upper and lower chambers of the heart (atrioventricular dyssynchrony). The investigators propose a new method to achieve atrioventricular synchrony in CRT based on measurements of electrical conduction from within the heart. Patients referred for CRT implantation at Castle Hill Hospital are eligible to participate. During CRT implantation, additional measurements, will be recorded from within the heart. After implantation, device settings will be adjusted to either standard or electrophysiologically-optimised settings with cross-over at 4 months. The investigators hypothesis is that patients with optimised settings will derive additional benefit compared to patients with standard pacemaker-determined settings.
Trial Health
Trial Health Score
Automated assessment based on enrollment pace, timeline, and geographic reach
participants targeted
Target at below P25 for not_applicable heart-failure
Started Sep 2016
1 active site
Health score is calculated from publicly available data and should be used for screening purposes only.
Trial Relationships
Click on a node to explore related trials.
Study Timeline
Key milestones and dates
First Submitted
Initial submission to the registry
April 20, 2016
CompletedFirst Posted
Study publicly available on registry
April 22, 2016
CompletedStudy Start
First participant enrolled
September 29, 2016
CompletedPrimary Completion
Last participant's last visit for primary outcome
April 28, 2017
CompletedStudy Completion
Last participant's last visit for all outcomes
March 15, 2018
CompletedJuly 17, 2019
July 1, 2019
7 months
April 20, 2016
July 15, 2019
Conditions
Outcome Measures
Primary Outcomes (1)
Change in amino-terminal pro-B-type natriuretic peptide (NT-proBNP)
7 months and 11 months
Secondary Outcomes (3)
Increase in 6-min walk test distance by ≥25 m
7 months and 11 months
≥5points improvement in the short Kansas City Cardiomyopathy Questionnaire score
7 months and 11 months
Reduction of left ventricular end-diastolic volume.
7 months and 11 months
Study Arms (2)
His-Ventricular (HV)-optimised
EXPERIMENTALHis-Ventricular (HV) optimised atrioventricular delay
Non-optimised
NO INTERVENTIONStandard atrioventricular delay
Interventions
Optimisation of atrioventricular pacing interval
Eligibility Criteria
You may qualify if:
- Clinical diagnosis of heart failure
- Referred for cardiac resynchronisation therapy (CRT) with or without defibrillator
- In sinus rhythm
- Patients must have a telephone
- Ability to give informed consent
- Ability to complete the study
You may not qualify if:
- Severe valve disease or previous valve replacement
- Previous atrial flutter ablation
- Chronic kidney disease Stage 3 or above
- Recent myocardial infarction
- Ongoing cardiac ischaemia
- Infiltrative cardiomyopathy
- Wolff-Parkinson White syndrome
- Presence of second or third degree heart block
- \<90% biventricular pacing at 3 months
- Hypertrophic cardiomyopathy
- Pregnancy or breastfeeding
- On treatment for hypothyroidism or hyperthyroidism
Contact the study team to confirm eligibility.
Sponsors & Collaborators
Study Sites (1)
Castle Hill Hospital
Hull, United Kingdom
MeSH Terms
Conditions
Condition Hierarchy (Ancestors)
Study Design
- Study Type
- interventional
- Phase
- not applicable
- Allocation
- RANDOMIZED
- Masking
- DOUBLE
- Who Masked
- PARTICIPANT, INVESTIGATOR
- Purpose
- TREATMENT
- Intervention Model
- CROSSOVER
- Sponsor Type
- OTHER GOV
- Responsible Party
- SPONSOR
Study Record Dates
First Submitted
April 20, 2016
First Posted
April 22, 2016
Study Start
September 29, 2016
Primary Completion
April 28, 2017
Study Completion
March 15, 2018
Last Updated
July 17, 2019
Record last verified: 2019-07
Data Sharing
- IPD Sharing
- Will not share