Addressing Tetrachloroethylene Exposure in an Impacted Community
1 other identifier
interventional
510
1 country
1
Brief Summary
Groundwater in Martinsville, IN, is contaminated by volatile organic compounds (VOCs), tetrachloroethylene (PCE) and trichloroethylene (TCE). Indoor air in some residential and commercial buildings is also contaminated with PCE and TCE. This study is being conducted to better understand the impact of low-level exposures to these compounds on community members' health. Data collected in this study will be used to help the community identify a course of action.
Trial Health
Trial Health Score
Automated assessment based on enrollment pace, timeline, and geographic reach
participants targeted
Target at P75+ for not_applicable
Started Feb 2023
Longer than P75 for not_applicable
1 active site
Health score is calculated from publicly available data and should be used for screening purposes only.
Trial Relationships
Click on a node to explore related trials.
Study Timeline
Key milestones and dates
First Submitted
Initial submission to the registry
December 5, 2022
CompletedStudy Start
First participant enrolled
February 17, 2023
CompletedFirst Posted
Study publicly available on registry
April 19, 2023
CompletedPrimary Completion
Last participant's last visit for primary outcome
May 31, 2028
ExpectedStudy Completion
Last participant's last visit for all outcomes
May 31, 2028
March 18, 2025
May 1, 2024
5.3 years
December 5, 2022
March 15, 2025
Conditions
Keywords
Outcome Measures
Primary Outcomes (3)
Change in concerns about environmental chemical contamination in Martinsville.
This measure is based on the differences between the percentage of "Yes" responses to a close-ended, not scaled question at 3 different time points, administered via repeated surveys to the same sample of respondents. Are participants concerned about environmental chemical contamination in Martinsville? Yes / Somewhat / No / Refuse 1a. Changes in concerns about environmental chemical contamination in Martinsville from Year 1 to Year 3. This is based on the differences in percentage of yes responses to this question in surveys administered in Year 1 (Main survey, baseline) and Year 3 (online survey administered at the beginning of Year 3). 1b. Changes in concerns about environmental chemical contamination in Martinsville from Year 1 to Year 5. This is based on the differences in percentage of yes responses to this question in surveys administered in Year 1 (Main survey, baseline) and Year 5 (Online survey, post intervention).
For Measure 1a, Time frame is from year 1 to year 3; for Measure 1b, Time frame is from year 1 to year 5.
Changes in awareness of possible exposure to chemicals from soil or groundwater in Martinsville.
This measure is based on the differences between the percentage of "Yes" responses to a close-ended, not scaled question at 3 different time points, administered via repeated surveys to the same sample of respondents. Are participants aware of possible exposure to chemicals from soil or groundwater in Martinsville? Yes / No / Refuse 2a. Changes in awareness of possible exposure to chemicals from soil or groundwater in Martinsville from Year 1 to Year 3. This is based on the differences in percentage of yes responses to this question in surveys administered in Year 1 (Main survey, baseline) and Year 3 (Online survey administered at the beginning of Year 3). 2b. Changes in awareness of available resources for exposure reduction from Year 1 to Year 5. This is based on the differences in surveys administered in Year 1 (Main survey, baseline) and Year 5 (Online survey, post intervention)
For Measure 2a, Time frame is from year 1 to year 3; for Measure 2b, Time frame is from year 1 to year 5.
Change in willingness to have respondent's homes tested for chemical contamination from contaminated soil or groundwater.
This measure is based on the difference between the percentage of "Yes" responses to a close-ended, not scaled question at 3 different time points, administered via repeated surveys to the same sample of respondents. Are participants willing to have their home tested for chemical contamination from contaminated soil or groundwater? Yes / No / Refuse / Don't know 3a. Changes in willingness to have respondents' homes tested for the chemical contamination from Year 1 to Year 3. This is based on the differences in percentage of yes responses to this question in surveys administered in Year 1 (Main survey, baseline) and Year 3 (Online survey at the beginning of Year 3) 3b. Changes in willingness to have respondents' homes tested for the chemical contamination from Year 1 to Year 5. This is based on the differences in differences in percentage of yes responses to this question in surveys administered in Year 1 (Main survey, baseline) and Year 5 (Online survey, post intervention)
For Measure 3a, Time frame is from year 1 to year 3; for Measure 3b, Time frame is from year 1 to year 5.
Study Arms (1)
Martinsville Residents
OTHERResidents of Martinsville, Indiana, will receive educational campaign promoting participation in environmental testing
Interventions
Educational campaign will be conducted to promote participation in indoor air testing.
Eligibility Criteria
You may qualify if:
- Residents of Martinsville, Indiana
- years or older
Contact the study team to confirm eligibility.
Sponsors & Collaborators
- Purdue Universitylead
- University of Illinois at Chicagocollaborator
- Indiana University School of Medicinecollaborator
- Mackey Children's Cancer Foundationcollaborator
Study Sites (1)
Purdue University
West Lafayette, Indiana, 47907, United States
MeSH Terms
Conditions
Condition Hierarchy (Ancestors)
Study Officials
- PRINCIPAL INVESTIGATOR
Sa Liu, MPH, PhD
Purdue University
Central Study Contacts
Study Design
- Study Type
- interventional
- Phase
- not applicable
- Allocation
- NA
- Masking
- NONE
- Purpose
- OTHER
- Intervention Model
- SINGLE GROUP
- Sponsor Type
- OTHER
- Responsible Party
- PRINCIPAL INVESTIGATOR
- PI Title
- Assistant Prof.
Study Record Dates
First Submitted
December 5, 2022
First Posted
April 19, 2023
Study Start
February 17, 2023
Primary Completion (Estimated)
May 31, 2028
Study Completion (Estimated)
May 31, 2028
Last Updated
March 18, 2025
Record last verified: 2024-05
Data Sharing
- IPD Sharing
- Will not share