NCT07781553

Brief Summary

Rotator cuff repair healing is highly variable with healing failure rates ranging from 11 to 94%. To this date, there are no specific biomarkers in shoulder tissues that can be associated with rotator cuff healing after surgery. The purpose of this study is to perform diagnostic imaging study (MRI without contrast), for research purposes, to subjects in the Orthopedics Biobank (IRB#202403832), to identify biomarkers associated with failure of rotator cuff repair healing. We will evaluate biomarkers in synovial fluid and shoulder tissues collected and analyzed as part of the IRB#202403832, and correlate the difference in biomarkers in patients that did and did not have signs of healing in the MRI. Secondarily, we aim to develop a model using demographics, radiographic parameters/MRI measurements and biomarkers to accurately predict rotator cuff repair healing rates at 1-year following surgery. This will be a study from a population of patients who are enrolled in the Orthopedic biorepository under IRB #202403832. Patients who underwent a rotator cuff repair will be invited to get an MRI without contrast of their operated shoulder at a period between 6 months to 1 year post-operative.

Trial Health

77
On Track

Trial Health Score

Automated assessment based on enrollment pace, timeline, and geographic reach

Enrollment
60

participants targeted

Target at P25-P50 for not_applicable

Timeline
12mo left

Started Sep 2026

Geographic Reach
1 country

1 active site

Status
recruiting

Health score is calculated from publicly available data and should be used for screening purposes only.

Trial Relationships

Click on a node to explore related trials.

Study Timeline

Key milestones and dates

First Submitted

Initial submission to the registry

August 18, 2026

Completed
6 days until next milestone

First Posted

Study publicly available on registry

August 24, 2026

Completed
8 days until next milestone

Study Start

First participant enrolled

September 1, 2026

Expected
11 months until next milestone

Primary Completion

Last participant's last visit for primary outcome

July 30, 2027

1 month until next milestone

Study Completion

Last participant's last visit for all outcomes

August 30, 2027

Last Updated

August 24, 2026

Status Verified

August 1, 2026

Enrollment Period

11 months

First QC Date

August 18, 2026

Last Update Submit

August 20, 2026

Conditions

Keywords

rotator cuff tear; rotator cuff healing

Outcome Measures

Primary Outcomes (1)

  • Rotator cuff healing

    Rotator cuff healing postoperatively, as assessed on MRI

    6 months to 1 year post-operative

Study Arms (1)

Rotator cuff repair

OTHER

All participants of the Orthopedics Biobank who underwent a rotator cuff repair will be part of arm 1

Diagnostic Test: MRN

Interventions

MRNDIAGNOSTIC_TEST

MRN without contrast

Rotator cuff repair

Eligibility Criteria

Age18 Years - 99 Years
Sexall
Healthy VolunteersNo
Age GroupsAdult (18-64), Older Adult (65+)

You may qualify if:

  • age 18-99 years partial or full thickness posterior superior rotator cuff tear that underwent surgical repair and are consented in the Orthopedics Biobank under IRB# 202403832.

Contact the study team to confirm eligibility.

Sponsors & Collaborators

Study Sites (1)

University of Iowa

Iowa City, Iowa, 52242, United States

RECRUITING

MeSH Terms

Conditions

Rotator Cuff Injuries

Condition Hierarchy (Ancestors)

RuptureWounds and InjuriesShoulder InjuriesTendon Injuries

Study Officials

  • Joseph Galvin, MD

    University of Iowa

    PRINCIPAL INVESTIGATOR

Central Study Contacts

Joseph Galvin, Other, MD

CONTACT

Maria F Bozoghlian, MD

CONTACT

Study Design

Study Type
interventional
Phase
not applicable
Allocation
NA
Masking
NONE
Purpose
BASIC SCIENCE
Intervention Model
SINGLE GROUP
Sponsor Type
OTHER
Responsible Party
SPONSOR INVESTIGATOR
PI Title
Assistant Professor

Study Record Dates

First Submitted

August 18, 2026

First Posted

August 24, 2026

Study Start (Estimated)

September 1, 2026

Primary Completion (Estimated)

July 30, 2027

Study Completion (Estimated)

August 30, 2027

Last Updated

August 24, 2026

Record last verified: 2026-08

Locations