NCT06929780

Brief Summary

The goal of this observational study is to develop and validate a predictive model for prolonged mechanical ventilation (PMV) following acute type A aortic dissection (ATAAD) surgery. The main questions it aims to answer are:

  1. 1.To validate the predictive performance of the model for PMV after ATAAD surgery
  2. 2.To assess the proportion of PMV among patients undergoing ATAAD surgery
  3. 3.To evaluate the ICU length of stay and operative mortality in patients with PMV following ATAAD surgery

Trial Health

43
At Risk

Trial Health Score

Automated assessment based on enrollment pace, timeline, and geographic reach

Trial has exceeded expected completion date
Enrollment
1,400

participants targeted

Target at P75+ for all trials

Timeline
Completed

Started Apr 2025

Shorter than P25 for all trials

Geographic Reach
1 country

1 active site

Status
not yet recruiting

Health score is calculated from publicly available data and should be used for screening purposes only.

Trial Relationships

Click on a node to explore related trials.

Study Timeline

Key milestones and dates

First Submitted

Initial submission to the registry

March 31, 2025

Completed
10 days until next milestone

Study Start

First participant enrolled

April 10, 2025

Completed
6 days until next milestone

First Posted

Study publicly available on registry

April 16, 2025

Completed
6 months until next milestone

Primary Completion

Last participant's last visit for primary outcome

September 30, 2025

Completed
Same day until next milestone

Study Completion

Last participant's last visit for all outcomes

September 30, 2025

Completed
Last Updated

April 16, 2025

Status Verified

April 1, 2025

Enrollment Period

6 months

First QC Date

March 31, 2025

Last Update Submit

April 8, 2025

Conditions

Keywords

Acute type A aortic dissectionProlonged mechanical ventilationmechanical ventilation time

Outcome Measures

Primary Outcomes (2)

  • The predictive performance of the model for prolonged mechanical ventilation (PMV) following acute type A aortic dissection (ATAAD) surgery

    The predictive performance of PMV following ATAAD surgery includes its discriminative ability and calibration ablility.

    72 hours after ATAAD surgery

  • The proportion of patients with PMV

    The proportion of patients with PMV refers to the proportion of patients with PMV among the total included ATAAD postoperative patients. PMV is defined as postoperative mechanical ventilation lasting more than 72 hours

    72 hours after ATAAD surgery

Secondary Outcomes (2)

  • ICU length of stay (ICU-LOS)

    From surgery to discharge or death, whichever came first, assessed up to 6 months

  • surgery-related mortality

    30 days after ATAAD surgery

Study Arms (2)

Development cohort

As the development cohort, this cohort retrospectively enrolled approximately 1000 postoperative patients undergoing acute type A aortic dissection (ATAAD) surgery to establish a clinical model for predicting the risk of prolonged mechanical ventilation (PMV) after ATAAD surgery.This cohort will also be utilized to analyze the risk factors for PMV following ATAAD surgery and their impact on clinical outcomes.

Validation cohort

As the validation cohort, this cohort retrospectively enrolled approximately 400 patients (from January 2024 to December 2024) who underwent ATAAD surgery to validate the predictive performance of the model.

Eligibility Criteria

Age18 Years - 18 Years
Sexall
Healthy VolunteersNo
Age GroupsAdult (18-64)
Sampling MethodNon-Probability Sample
Study Population

ATAAD postoperative patients admitted to SICU

You may qualify if:

  • Age ≥18 years;
  • Diagnosis of acute type A aortic dissection (ATAAD) confirmed by computed tomography angiography and echocardiography;
  • Patients who underwent aortic surgery requiring cardiopulmonary bypass (CPB), were admitted to the surgical intensive care unit (SICU), and received mechanical ventilation.

You may not qualify if:

  • Reintubation;
  • Intraoperative death or failure to survive beyond 72 hours postoperatively;
  • Pregnancy;
  • Severe comorbidities (e.g., lung cancer);
  • Missing critical outcome data (e.g., short-term mortality, mechanical ventilation duration, reintubation).

Contact the study team to confirm eligibility.

Sponsors & Collaborators

Study Sites (1)

Fuwai Hospital

Beijing, Beijing Municipality, 100029, China

Location

Central Study Contacts

Zhou Xiaoming, Dr

CONTACT

Study Design

Study Type
observational
Observational Model
COHORT
Time Perspective
RETROSPECTIVE
Sponsor Type
OTHER
Responsible Party
PRINCIPAL INVESTIGATOR
PI Title
Professor

Study Record Dates

First Submitted

March 31, 2025

First Posted

April 16, 2025

Study Start

April 10, 2025

Primary Completion

September 30, 2025

Study Completion

September 30, 2025

Last Updated

April 16, 2025

Record last verified: 2025-04

Data Sharing

IPD Sharing
Will not share

Locations