Swan-Ganz Catheter Insertion
SG cath
The Effect of Pause at the Right Ventricle on Success Rate of Final Placement in Swan-Ganz Catheterization
SG cath
The Effect of Pause at the Right Ventricle on Success Rate of Final Placement in Swan-Ganz Catheterization
Sponsor study identifier
interventional
112
1 country
1
Study Start
April 29, 2019
Estimated (date passed)This estimate has passed. The registry has not confirmed an actual date for this milestone.
Primary Completion
March 30, 2020
Estimated (date passed)This estimate has passed. The registry has not confirmed an actual date for this milestone.
Study Completion
April 30, 2020
Estimated (date passed)This estimate has passed. The registry has not confirmed an actual date for this milestone.
The goal of this prospective randomized controlled study is to investigate the effect of pause of advancement of the Swan-Ganz catheter, which is to check whether the Swan-Ganz catheter arrive exactly at the right ventricle or not, on success rate of final placement and required time in Swan-Ganz catheterization. The question which the investigators are trying to answer is: Continuous advancement of Swan-Ganz catheter without intended pause in the right ventricle to check whether the Swan-Ganz catheter arrive exactly at the right ventricle will decrease the trial number and required time to success final placement of Swan-Ganz catheter?
Registry-reported information. Elapsed time and enrollment totals alone do not measure study progress or recruitment pace.
April 30, 2020
Estimated (date passed)This estimate has passed. The registry has not confirmed an actual date for this milestone.
Click on a node to explore related trials.
Some registry-reported names shown below are not yet linked in this graph.
Dates and qualifiers reported by the registry. Estimated dates do not confirm that a milestone has occurred.
April 25, 2019
Actual (reported)April 29, 2019
Actual (reported)April 29, 2019
Estimated (date passed)This estimate has passed. The registry has not confirmed an actual date for this milestone.
March 30, 2020
Estimated (date passed)This estimate has passed. The registry has not confirmed an actual date for this milestone.
April 30, 2020
Estimated (date passed)This estimate has passed. The registry has not confirmed an actual date for this milestone.
trial number (n)
trial number to success placement of Swan-Ganz catheter placement into the pulmonary artery.
during Swan-Ganz catheterization procedure
Success rate (%)
Success rate in placement of Swan-Ganz catheter placement into the pulmonary artery
during Swan-Ganz catheterization procedure
required time (seconds)
total time to success Swan-Ganz catheter placement into the pulmonary artery
during Swan-Ganz catheterization procedure
incidence of arrhythmia (n)
during Swan-Ganz catheterization procedure
direction of placement of Swan-Ganz catheter (n)
during Swan-Ganz catheterization procedure
When the practitioner or expert investigator recognize that the tip of Swan-Ganz catheter arrive in the right ventricle, the practitioner pause the advancement for 10 sec. Next, the practitioner re-advance it to the pulmonary artery.
When the practitioner or expert investigator recognize that the tip of Swan-Ganz catheter arrive in the right ventricle, the practitioner advance it continuously without pause to the pulmonary artery.
When the practitioner or expert investigator recognize that the tip of Swan-Ganz catheter arrive in the right ventricle, the practitioner pause the advancement for 10 sec. Next, the practitioner re-advance it to the pulmonary artery.
When the practitioner or expert investigator recognize that the tip of Swan-Ganz catheter arrive in the right ventricle, the practitioner advance it continuously without pause to the pulmonary artery.
Seoul National University Boramae Hospital
Seoul, 07061, South Korea
Jung-Man Lee, M.D.,PhD
SMG-SNU Boramae Medical Center
First Submitted
April 25, 2019
First Posted
April 29, 2019
Study Start
April 29, 2019
Estimated (date passed)This estimate has passed. The registry has not confirmed an actual date for this milestone.
Primary Completion
Registry-reported names are shown in full. Names without a link have not yet been matched to a Syfrah profile.
Contact the study team to confirm eligibility.
March 30, 2020
This estimate has passed. The registry has not confirmed an actual date for this milestone.
Study Completion
April 30, 2020
Estimated (date passed)This estimate has passed. The registry has not confirmed an actual date for this milestone.
Last Updated
May 1, 2019
Record last verified: 2019-04
Download the complete ClinicalTrials.gov record imported by Syfrah, including fields not shown in this page. The registry may contain a newer revision.
Source: ClinicalTrials.gov.
JSON downloads include source attribution and retrieval details alongside the unchanged original record or the separately normalized values.
Source retrieved: